Past Solicitations

Past solicitations are posted online until six-months from the closing date. If the item you are seeking is not shown below, please contact Contract and Procurement Services to inquire, (512) 414-2204.

Review Past Solicitations

For closed solicitations published through ÁùºÏ±¦µä's Bonfire Portal, please visit the  and select Past Public Opportunities.

Select the category below.

Project Number Title (RFP) (CSP) (IFB) Addenda Due Date 2:00 PM
21RFP061

Planning Partner for Facilities Master Plan

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers

Addendum 2 - Change in Board Date

Addendum 3 - Additional HUB Documents

Bid Opening Sign-in Sheet

1/5/21
21RFP057

Internet Firewall Replacements - E- Rate Project

Attachment A - Cost Estimate Worksheet

Attachment B - Firewall Installation and Configuration Guide Example

Attachment C - Firewall Acceptance Checklist Example

 

 

 

Addendum 1-Questions and Answers 12/16/20
21RFP058

 Internet Router Upgrades - E-Rate Project

Attachment A - Cost Estimate Worksheet

Attachment B - Router Installation and Configuration Guide Example

Attachment C - Router Installation Acceptance Checklist Example

 

 

 

 

  12/16/20
21RFP059

Campus Distribution Switches - E-Rate Project

Attachment A - Cost Estimate Worksheet

Attachment B - Switch Installation and Configuration Guide Example

Attachment C - LAN Acceptance Checklist

 

 

 

 

Addendum 1-Questions and Answers 12/16/20
21RFP060

Wireless Upgrades - E-Rate Project

Attachment A - Cost Estimate Worksheet

Attachment B - WLAN Installation and Configuration Guide Example

Attachment C - WLAN Acceptance Checklist Example

 

 

Addendum 1-Questions and Answers

Addendum 2 - REVISED Attachment A - Cost Estimate Worksheet

 

12/16/20
21RFP062

School Mental Health Centers at Elementary, Middle and High
Schools

Attachment A - Scope of Service and Performance Requirement Offer Form

Attachment B - Financial Proposal Offer Form

Addendum 1-Questions and Answers 12/11/20
21RFP024 Youth & Family Enrichment OST Programs (Phase I)

Addendum 1-Questions and Answers

Addendum 2- Revised Instructions

12/01/20
21RFP025

Fine Arts & Creative Learning Partnerships (Phase I)

Attachment A: Application

Exhibit A: Scoring Rubric

Addendum 1-Updated Posting

Addendum 2-Questions and Answers

Addendum 3-Revised Instructions

12/01/20
21IFB047

Heating, Ventilation, A/C & Refrigeration Repair Parts
(HVAC & Refrigeration Repair Parts)

Attachment A

Attachment B

Attachment C

Addendum 1 - Virtual Bid Opening 

Addendum 2  

10/30/20
21RFP033 Career and Technical Education (CTE) Collaborative Curriculum Instructional Services Addendum 1 - Questions and Answers 09/22/20
21IFB008

Paints and Supplies

Attachment A Percentage Discount Fillable Final

Attachment B Representative Pricing Formulas Postings

Addendum 1 - Virtual Bid Opening via Zoom

Addendum 2 - Deadline Extension and Cancellation of Virtual Bid Opening

Addendum 3 - Virtual Bid Opening

06/25/20
21RFP007 Real Estate Consultant

Addendum 1 - Questions and Answers

Addendum 2 - Virtual Bid Opening

Addendum 3 - List of Offerors

06/30/20
21RFP111 ÁùºÏ±¦µä ISD/Alternative Learning Center– Mental Health Substance Abuse Services Questions and Answers 05/12/20
20IFB116

Food Services HACCP Manager System

Attachment A - Specifications

Addendum 1 - Bid Submission

Addendum 2 - Bid Opening Cancellation

Questions and Answers

Addendum 3 - Notice of Cancellation

5/13/20
Cancelled
20RFP097

Employee Assistance Program

Attachment 01-2020 EAP RFP Questionnaire

Attachment 02-2018 Revive EAP Resources for Living Annual Executive Summary

Attachment 03 - ÁùºÏ±¦µä ISD Zip Code Census( Excel)

Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

 

Addendum 1 - Questions and Answers

Addendum 02

03/03/20
21IFB036 Musical Instrument Repair & Service

Addendum 1-Questions and Answers

Addendum 2 - Due Date Extension

10/29/20
21IFB031 Books & Prepared A/V Materials

Addendum 1-Questions and Answers

Addendum 2-Due Date Extension

10/29/20
21IFB014 Bulk Engine Oil   08/25/2020
20RFP033
Phase I Fine Arts & Creative Learning Partnerships
Addendum 1 - Due Date Extension
05/26/2020
20RFP032 Phase I Youth & Family Enrichment OST Programs
Addendum 1 - Due Date Extension
05/26/2020
20RFP071 Disposal, Recycling and Asset Recovery Services of Surplus Technology Equipment

Addendum 1

Addendum 2 - Revised Solicitation Schedule and Bid Submission

Addendum 3-  Correction to Bid Submission Date

Addendum 4 - Questions and Answers

05/26/2020
21RFP013 Mass Notification Service (For Communication in the K-12 School District Environment) Addendum 1 - Questions and Answers 07/21/2020
21RFP009 Special Education Contracted Services

Addendum 1 - Questions and Answers

07/02/2020
20RFP112
Online Facility Rental System Questions and Answers 06/09/2020
21RFP004 School Mental Health Centers at Elementary, Middle and High Schools Addendum 1 - Questions and Answers  05/28/2020
20RFP108

District Communication Support and Strategic Communications

Due to closure of ÁùºÏ±¦µä schools and offices on Friday, March 13, 2020, the Addendum with Vendor Questions and Answers will be posted at a later date.

Addendum 1 - Vendor Proposals Due Date Extension

Addendum 2 - Updated Solicitation Schedule

Addendum 3 -  Revised Instructions for Submission of Vendor Proposals

Addendum 4 -Vendor Proposals Due Date Extension

Addendum 5- Notice of Cancellation

03/24/2020
20RFP092

Campus Switch Upgrade - Phase 2 (ÁùºÏ±¦µä ISD E-Rate Project)

 Attachment A - Cost Estimate Worksheet

Attachment B - Switch Installation and Configuration Guide Example

Attachment C - Acceptance Checklist

Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

  02/20/2020
20RFP110 ÁùºÏ±¦µä Teen Parent Child Care Services

Addendum 1 - Vendor Proposal Due Date Extension

Addendum 2 - Revised Instructions for Submission of Vendor Proposals

04/07/2020
20RFP101

Food Services, Tortilla Products (Word)

Attachement A - Specifications (Excel)

Attachment B - Reference Check List (Word)

Attachment C - Product Sample (Word) 

Reference Documents 1-6 (ZIP)

Addendum 1 - Attachment A (additional line item)

Questions and Answers

Addendum 2 - Delivery Time & Location; Timeline, Bid Opening Date 

Addendum 3 - Bid Submission

Addendum 4 - Bid Opening Cancellation

Addendum 5 - Updated Solicitation Schedule

4/13/20
20RFP100

Food Services, Miscellaneous Food Items (Word)

Attachement A - Specifications (Excel)

Attachment B - Reference Check List (Word)

Attachment C - Product Sample (Word)

Reference Documents 1-6 (ZIP)

Addendum 1 - VI. Scope Section 4. Specifications and Documentation

Questions and Answers

Addendum 2 - Delivery Time & Location; Timeline, Bid Opening Date 

Addendum 3 - Bid Submission

Addendum 4 - Bid Opening Cancellation

Addendum 5 - Updated Solicitation Schedule

4/13/20
20RFP099

Food Services, Fresh Produce (Word)

Attachement A - Specifications (Excel)

Attachment B - Reference Check List (Word)

Reference Documents 1-5 (ZIP)

Questions and Answers

Addendum 1 - Delivery Time & Location; Timeline, Bid Opening Date 

Addendum 2 - Bid Submission

Addendum 3 - Bid Opening Cancellation

Addendum 4 - Updated Solicitation Schedule

4/13/20
20RFP117 Executive Search / Recruitment Services

Addendum 1-Questions and Answers / Revisions to Bid Required Forms

Addendum 2

03/24/2020
20RFP0058 Translation, Interpretation, Transcription and Sign Language Services Addendum 1- Questions and Answers  03/10/2020
20RFP098 ÁùºÏ±¦µä-District Wide Professional Learning Services Addendum 1-Questions and Answers 03/05/2020
20RFP097

Employee Assistance Program

Attachment 01-2020 EAP RFP Questionnaire

Attachment 02-2018 Revive EAP Resources for Living Annual Executive Summary

Attachment 03 - ÁùºÏ±¦µä ISD Zip Code Census( Excel)

Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

Addendum 1 - Questions and Answers

Addendum 02

03/03/2020
20CSP037 Instructional Assessment and Learning Management Software for Career and Technical Education Addendum 1-Questions and Answers 1/16/20
20RFP082 LED Marquee Signs

Addendum 1- Questions and Answers 

Addendum 2- Questions and Answers

1/10/20
20RFP077

Internet Router Upgrade - ÁùºÏ±¦µä South Campus Locations

Attachment A - Cost Estimate Worksheet (Excel doc)

Attachment B - Router Installation and Configuration Guide (Example)

Attachment C - Router Installation Acceptance Checklist (Example) 

Addendum 1- Questions and Answers 1/08/20
20RFP053

Internet Router Upgrade - ÁùºÏ±¦µä North Campus Locations

Attachment A -  Cost Estimate Worksheet (Excel doc)

Attachment B -  Router Installation and Configuration Guide (Example)

Attachment C -  Router Installation Acceptance Checklist (Example) 

Addendum 1- Questions and Answers 1/08/20
20RFP055

 Campus LAN Switch Upgrades

Attachment A -  Cost Estimate Worksheet (Excel)

Attachment B - Switch Installation and Configuration Guide - Example

Attachment C -  LAN Acceptance Checklist - Example

Addendum 1
12/18/19
20IFB082

Fire/Security Alarm Access Control Equipment 

Attachment A - 20IFB082 Excel for Vendors (Excel)

  12/10/19
20RFP070

 Internet Access Service - Commodity Bandwidth - ÁùºÏ±¦µä North Campus Locations

 Attachment A - Price Sheet

 Attachment B - Technical Questionnaire

Addendum 1 12/4/19
20RFP076

 Internet Access Service - Commodity Bandwidth - ÁùºÏ±¦µä South Campus Locations

Attachment A - Price Sheet

Attachment B - Technical Questionnaire

Addendum 1 12/4/19
20RFP027 Internet & Social Media Screening Services Addendum 1- Questions and Answers 11/14/19
20RFP057 Language Immersion Instructional Program  
11/5/19
19RFP021 Fine Arts & Creative Learning Partnerships (Phase II) 

Addendum 1 - Questions and Answers

Addendum 2 - Due Date Extension

11/20/19
19RFP020
Youth & Family Enrichment OST Programs (Phase II)

Addendum 1 - Questions and Answers

Addendum 2 - Due Date Extension

11/20/19
20RFP029 Blended and Personalized Learning Coach Professional Development

Addendum 1 - Questions and Answers

Addendum 2 - RFP Opening Date Extension

10/8/19
20IFB056 Copier Paper Addendum 1 - Questions and Answers 10/24/19
20RFP026
 
Speech Therapy, Occupational and Physical Therapy, Evaluation and Related Special Education Services Addendum 1 - Questions and Answers 10/15/19
20CSP050

HVAC and Electrical Replacements at Linder Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - Updates to Drawings

Pre-bid Sign-in Sheet

Addendum 2 - Additional Walk Through

Addendum 3 - Update to Drawings, and Clarification

Bid Opening Sign-in Sheet

12/17/19
20RFP010

Medical and Pharmacy Health Benefit Products

Attachment A - RFP Questionnaire (Word)

Attachment B - RFP Workbook (Excel)

Attachment C - RFP Pharmacy (Excel)

Attachment D - Summary Plan Description Booklets

Attachment E - Cobra and Active Census Data (Excel)

Attachment F.1. - Monthly Claims from Jan. 01, 2015 to Jan. 31, 2017 (includes pharmacy claims) (Excel)

Attachment F.2. - Monthly Claims from Jan. 01, 2017 and Dec. 01, 2018 Claims (Excel)

Attachment G - RX Claims (Excel)

Attachment H.1. - Aetna Select Medical Plan Schedule of Benefits 4A

Attachment H.2. - Aetna Select Medical Plan Schedule of Benefits 4B

Attachment H.3. - Aetna Select Medical Plan Schedule of Benefits 4CREV

Attachment H.4. - Aetna Select Medical Plan Schedule of Benefits 4C

Attachment I - Current Pharmacy Benefits Plans

Addendum 1 - Questions and Answers

Addendum 1- Attachment A (Excel)

Addendum 1- Attachment B (Excel)

Addendum 1- Attachment C (Excel)

Addendum 1- Attachment D (Excel)

Addendum 2 - Question and Answer

Addendum 2- Attachment A (Excel)

10/29/19
20RFQ019
Financial Adviser
Addendum 1 - Questions and Answers 10/2/19
20RFP039

Food Services Paper Goods

Attachments:

Questions and Answers 10/2/19
20IFB015

Nurse and First Aid Supplies and Equipment

Attachment 1 - Bid Response Form (Excel)

Appendix 1 – Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

HUB Documents:

Addendum 1 - Questions and Answers 9/12/19
20RFP025

  9/10/19
20IFB014

Musical Instrument Repair & Service

Attachment 1 - Bid Response Form

Appendix 1 – Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

HUB Documents:

Addendum 1

Addendum 2-Proposal Due Date Extension

Addendum 3-Proposal Due Date Extension

9/3/19
20CSP011

Electrical and Site Drainage Improvements at Reagan HS

Wage Rates

HUB Documents:

Pre-Bid Sign-In Sheet

Addendum 1 - Clarification and Re-issued Drawings

Addendum 2 - Questions and Answers

Opening Sign-In Sheet

8/27/19
20AUC008

This is an ÁùºÏ±¦µä Reverse Auction through . Please see all content, Key Dates, and attachments with this before you submit your bids online through Sorcity and your final pricing on the linked Bid Form. Contact Sorcity with questions at: 512-366-9040

Questions & Answers

Addendum 1

Addendum 2

8/8/19
20AUC002

This is an ÁùºÏ±¦µä Reverse Auction through Sorcity.com. Please see all content, Key Dates, and attachments with this before you submit your bids online through Sorcity and your final pricing on the lin

Addendum 1 - Timeline Extension 8/7/19
20RFQ006

Legal Consulting Services for ÁùºÏ±¦µä ISD

HUB Documents:

Addendum 1 - Q&A

Addendum 2-Proposal Due Date Extension

7/18/19
20RFQ005

Special Counsel to the ÁùºÏ±¦µä ISD Board of Trustees

HUB Documents:

Addendum 1 - Q&A

Addendum 2 - Proposal Due Date Extension

7/18/19
19RFP111 Parent-Child Early Intervention Education Program   07/11/19
20AUC001

This is an ÁùºÏ±¦µä Reverse Auction through Sorcity.com. Please see all content, Key Dates, and attachments with this before you submit your bids online through Sorcity and your final pricing on the linked Bid Form. Contact Sorcity with questions at: 512-366-9040

Addendum 1 - Specification Change

Questions and Answers

7/23/19
19RFQ118

Rosedale and New Northeast Middle School Design Build

HUB Documents:

List of Respondents:

Step 1: Rosedale and New Northeast Middle School Design Build

Pre-Bid Sign-In Sheet

Addendum 1 - Extension of Interview Dates

Addendum 2 - Questions and Answers

Addendum 3 - Questions and Answers, Updated Procurement Schedule

Addendum 4 - Updated Procurement Schedule

Addendum 5 - Questions and Answers

Step 1: 4/11/19

Step 2: 5/6/29

19RFP021
Fine Arts & Creative Learning Partnerships
Addendum 1 - Q&A 4/23/19
19RFP020
Youth & Family Enrichment OST Programs
Addendum 1 - Q&A 4/23/19
19RFP129

School Mental Health Centers at Elementary, Middle and High Schools 

Note: This RFP replaces non-awarded RFPs 19RFP059 and 19RFP115

Attachment A - Scope of Service and Financial Proposal Offer Form

Addendum 1 - 19RFP129 COMPLETE- School Mental Health Services - Revision 4/5/19

Addendum 1- Revised Attachement A-Offer Form 4/5/19 (MS Word)

Addendum 2 - Questions and Answers

4/17/19
19RFP20 Youth & Family Enrichment OST Programs Addendum 1 - Q&A 04/23/19
19RFP021 Fine Arts & Creative Learning Partnerships Addendum 1 - Q&A 4/23/19
19IFB050

Books & Prepared A/V Materials

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Question & Answers 3/28/19
19RFP110

ÁùºÏ±¦µä – District Wide Professional Development Services

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Questions & Answers 3/27/19
19AUC119

Kitchen Maintenance and Repair Services

This is an ÁùºÏ±¦µä Reverse Auction through Please see all content, Key Dates, and attachments with this before you submit your bids online through Sorcity and your linked Attachment A bid form. Contact Sorcity with questions at: 512-366-9040.

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1

Addendum 2

Addendum 3 - Timeline Updated

Addendum 4 - Bid Requirements

Questions & Answers

3/27/19
19RFP106

Human Sexuality & Responsibility Curriculum

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Question & Answers

Addendum 2 - Proposal Format & Submittal

3/27/19
19RFP095

Online Learning Environments & Web-Based Curriculum

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

3/26/19
19CSP109 Property Insurance   3/1/19
19RFP108

Private Duty Nursing Services

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Questions and Answers 2/28/19
19RFP113 Vertical System of Sustainable Partnerships

Addendum 1 - Proposal Due Date Correction

Addendum 2 - Revised Due Date

3/5/19
19RFP115 School Mental Health Centers at Elementary, Middle and High Schools Addendum 1 - Questions and Answers 2/22/19
19RFP009

Grease Trap Services

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Correction to Attachment A listing schools and facilities and school closures

Addendum 2 - RFP Due Date Change

2/21/19
19RFP101

 Analysis of Pre-K Enrollment Business Process

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 -  Change to Proposal Due Date

Addendum 2 - Question and Answer

2/19/19
19RFP079

Air Condition and Heating (HVAC) Maintenance and  Repair Services

HUB Documents:

Addendum 1 - Questions and Answers 1/29/19
19CSP069

Enterprise Backup Systems

Appendix A - Cost Estimate Worksheet

HUB Documents:

Addendum 1 - Questions and Answers

Addendum 2 -Questions and Answers

1/23/19
19RFP059

School Mental Health Centers

HUB Documents:

  1/23/19
19CSP066

Web-Based Activity Fund

HUB Documents:

Addendum 1 - Questions and Answers 1/23/19
19CSP076

Campus Network Upgrades

HUB Documents:

Addendum 1 1/8/19
19CSP075

Broadband Network Upgrades

HUB Documents:

  1/8/19
19CSP030

Interactive Video Software Tool

HUB Documents:

Addendum 1 - Policy CHE (Local) 11/8/18
19IFB056

Musical Instrument Repair & Services

HUB Documents:

11/8/18
19IFB019

Musical Instruments & Equipment

HUB Documents:

11/8/18
Project Number Title (RFP) (RFQ) Addenda Due Date 2:00 PM
21RFQ001

Annual Financial Audit

Attachment A - Evaluation Worksheet

Attachment B - Audit Schedules

Attachment C - Investment Portfolio

Addendum - 1

Virtual Bid Opening

Addendum 2-List of Respondents

10/19/20
20RFQ122

Facility Condition and Educational Suitability Assessments

Exhibit B - Agreement Between Owner and Architect/ Engineer

HUB Documents:

Pre-Proposal Sign in Sheet

Addendum 1 - Questions and Answers, Changes to RFQ

5/5/20
20RFP121

Planning Partner for Facilities Master Plan

HUB Documents:

Pre-Proposal Sign-in Sheet

Addendum 1 - Questions and Answers, Clarification Regarding the Scope

Addendum 2 - Notice of Cancellation

5/5/20
20RFQ095

Group Health Benefits Consulting Services

Attachment 1 - Fee Schedule

Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

Addendum 01-Questions and Answers

Addendum 1_Attachment 02 - P14-021 Gallagher Benefit Services, Inc. Agreement

Addendum 1_Attachment 03 - Stop Loss Policy - Aetna

Addendum 02

Addendum 03

02/20/2020
19RFQ052

HUB Documents:

10/16/18
Project Number Title / (RFP)(CMA, CMR, JOC) Addenda Due Date 2:00 PM
21CSP070

Electrical and Plumbing Repairs at Burnet Middle School

HUB Documents:

Addendum 1 - Site Visit Details

Pre-Bid Sign-in Sheet

Addendum 2 - Changes to Drawings

Bid Opening Sign-in Sheet

2/9/21
21CSP068

District wide Kitchen Hood Suppression System Replacement

HUB Documents:

Pre-Bid Sign-in Sheet

Addendum 1 - Questions and Answers

2/4/21
21CSP065

Improvements at Blanton Elementary School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Pre-proposal Conference Clarification

Pre-bid Sign-in Sheet

Addendum 2 - Updated Bid Bond Requirements

Addendum 3 - Modifications to Drawings

Addendum 4 - Notice of Cancellation

1/7/21
21CSP055

Critical Repairs at Webb Middle School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Submittals Request

Addendum 2 - Updated Bid Bond Requirements

Addendum 3 - Updated Division 01 Specifications

Pre-bid Sign-in Sheet

Addendum 4 - Additional Site Visit Information

Bid Opening Sign-in Sheet

1/7/21
21CSP054

Roofing Upgrades and HVAC Replacement at Cowan Elementary School Project Manual Forms 1-7

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Updated Bid Bond Requirements

Addendum 2 - Construction Schedule Requirements, Roof Access Requirements, Equipment Asset Form Requests, Equipment Submittals Requirement, and Updated Submission and Responsiveness Checklist

Addendum 3 - Additional Site Visit Information

Addendum 4 - Additional Q&A

Bid Opening Sign-in Sheet

1/6/21
21CSP050

Renovations at Lively Middle School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Site Visit Details

Pre-bid Sign-in Sheet

Addendum 2 - Updated Bid Bond Requirements

Bid Opening Sign-in Sheet

1/6/21
21CSP049

HVAC Upgrades at Kealing Middle School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Updated Bid Bond Requirements

Addendum 2 - Additional Site Visit Information

Addendum 3 - Questions and Answers, Changes to Project manual and Drawings, Clarifications

Bid Opening Sign In Sheet

Pre-Bid Sign-in Sheet

1/5/21

21CSP053

HVAC Replacement at Kiker Elementary School Project Manual Forms 1-7

HUB Documents:

Pre-bid Opening Sign-in Sheet

Addendum 1 - Updated Bid Bond Requirements

Addendum 2 - Addition to Specifications and Additional Requested Information

Bid Opening Sign-in Sheet

12/16/20
21CSP046

Various Improvements and Window Replacement at Barrington Elementary School Project Manual Forms 1-7

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Clarifications and Changes to Specifications and Drawings

Addendum 2 - Questions and Answers, Updated Proposal Form, and Changes to Specifications and Drawings.

Bid Opening Sign-in Sheet

12/8/20
21CSP051

Renovations at Pickle Elementary School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Site Visit Details, Additions and Revisions to Specifications and Drawings

Pre-bid Sign-in Sheet

Addendum 2 - Clarifications and Answers to Questions, Updated Proposal Form, and Deficiency Reports

Bid Opening Sign-in Sheet

Addendum 3 - Notice of Cancellation

12/3/20
21CSP044

Cooling Tower Replacement and Various Upgrades at Widen Elementary Project Manual Forms 1-7

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers

Bid Opening Sign-in Sheet

 

12/2/20
21CSP041

HVAC Replacement at Williams Elementary School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Updated Due Date, and Budget Clarification

Addendum 2 - Updates to Drawings

Bid Opening Sign-in Sheet

12/2/20
21CSP042

Roofing Repairs at Dawson Elementary Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Additional Specifications

Addendum 2 - Questions and Answers, Substitution Requests, Updated Specs and Drawings

Bid Opening Sign-in Sheet

12/1/20
21CSP043

Various Upgrades at Travis High School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Updated Site Visit Details

Site Visit Sign-in Sheet

Addendum 2 - Questions and Answers, and Revisions to Drawings

Bid Opening Sign-in Sheet

11/19/20
21CSP039

HVAC and Structural Repairs at Kocurek Elementary School Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Revised Table of Contents and Additional Specifications

Pre-bid Sign-in Sheet

Addendum 2 - Additional Specifications

Addendum 3 - Updated Bid Opening Time

Bid Opening Sign-in Sheet

11/19/20
21CSP040

HVAC and Electrical Repairs at McCallum High School Project Manual Form 1-7

HUB Documents:

Addendum 1 - Clarification of Dollar amount for "Owner's Unforeseen Conditions Allowance", Additions and Revisions to Specifications and Drawings

Pre-Bid Sign-in Sheet

Bid Opening Sign-in Sheet

Addendum 2 - Notice of Cancellation

11/5/20
21CSP035

HVAC and Electrical Repairs at LASA Project Manual Form 1-7

HUB Documents:

Addendum1 - Project Title Change, Update to Site Visit Details, Asbestos Abatement ESMHS

Pre-bid Sign-in Sheet

Addendum 2 - Asbestos Abatement Clarification

Addendum 3 - Questions & Answers, Project Construction Schedule, Equipment Information, and Addition Project Information

21CSP035_200036-LASA _ ASID Campus MEP Asset Form-Addendum 3 Exhibit A

Addendum 4 - Project Start Date

Bid Opening Sign-in Sheet

11/4/20
21CSP034

Roofing Repairs at Martin Middle School Project Manual Form 1-7

HUB Documents:

Addendum 1 - Corrections to Project Manual Coversheet

Pre-bid Sign-in Sheet

Addendum 2 - Revisions to Specifications and Drawings

Bid Opening Sign-in Sheet

11/3/20
21CSP037

Renovations at Bedichek Middle School Project Manual Form 1-7

HUB Documents:

Addendum 1 - Site Visit Details

Addendum 2 - Asbestos Abatement Guide

Addendum 3 - Question and Answer Extension  and Updates to Solicitation Schedule

Pre-Bid Sign-in Sheet

Addendum 4 - New Asbestos Abatement, and New and Revised Drawings and Specifications

Addendum 5 - Update to Project Manual Forms 1-7

Addendum 6 - Additional Site Visits

Addendum 7 - Questions and Answers, Revised Drawings and Specifications

Addendum 8 - Revised Proposal Form

Bid-Opening Sign-in Sheet

10/28/20
21CSP020

Security System Design and Installation for Middle Schools and High Schools Project Manual Form 1-7

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Additional Information to the Scope

Addendum 2 - Historical ÁùºÏ±¦µä Middle Schools and High Schools Architectural and Intrusion Alarm Drawings 

Addendum 3 - Questions and Answers

Addendum 4 - Schedule Update

10/6/20
updated

9/29/20

21CSP021

Roof Improvements to Graham Elementary School Project Manual Form 1-7

HUB Documents:

Addendum 1 - Site Visit Details

Pre-bid Sign-in Sheet

Addendum 2 - Questions & Answers, Substitution Requests, and Updates to Specifications and Drawings

10/1/20
21CPS019

Electrical and Structural Upgrades to Burger Athletic Complex Project Manual Form 1-7

HUB Documents:

  9/15/20
21CSP015

Renovations at Maplewood Elementary Project Manual Form 1-7

HUB Documents:

Pre-Bid Sign-in Sheet

Addendum 1 - Questions & Answers, Update to Drawings and Specifications

9/9/20
21CSP016

Renovations at Joslin Elementary Project Manual Form 1-7

HUB Documents:

Addendum 1 - Questions & Answers, Modifications to Contract Document

Bid Opening Sign-in Sheet

9/8/20
21CSP010

Catering and Test Kitchen for Food Services Project Manual Form 1-7

HUB Documents:

Addendum 1 - Site Visit Details

Pre-bid Sign-in Sheet

Addendum 2 - Questions and Answers

Addendum 3 - Correction to Questions and Answers

Addendum 4 - Accepted Substitutions

Bid-Opening Sign-in Sheet

8/5/20
21CSP011

Replace Fire Control Panels District Wide Solicitation_Project Manual Forms 1-7

HUB Documents:

Addendum 1 - Site Visit Schedule

Pre-bid Sign-in Sheet

Addendum 2 - Project Sites Inspection Reports

Addendum 3 - Project Sites Elevator Listings

Addendum 4 - Questions & Answers, Changes to Specifications

Addendum 5 - Correction to Prevailing Wage Rates

8/4/20
20CSP124

Academic Reinvention: Technology Career Launch Program @ NECHS (Solicitation)

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Updates to Project Manual, Questions and Answers, Site Visit, Updated Submission Checklist, Additional Required Forms for Submission, Updates to Construction Documents

5/12/20
20RFQ095

Group Health Benefits Consulting Services

Attachment 1 - Fee Schedule

Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL

Addendum 01-Questions and Answers

Addendum 1_Attachment 02 - P14-021 Gallagher Benefit Services, Inc. Agreement

Addendum 1_Attachment 03 - Stop Loss Policy - Aetna

Addendum 02

Addendum 03

02/20/2020
20CSP106

Roof Improvements to Akins High School Project Manual

Notice of Prevailing Wage Rates

Drawings and Specifications

HUB Documents:

Pre-Bid Sign-in Sheet

Addendum 1 - Changes to Bid Documents, and Requests for Substitutions

Addendum 2 - Changes to Bid Documents

Addendum 3 - Revised Solicitation Schedule

Addendum 4 - Bid Delivery and Opening Instructions

Addendum 5 - Updated Bid Delivery and Opening Instructions, Questions and Answers

Bid Opening Sign-in Sheet

4/16/20
20RFQ107

Design Services for LASA, Lamar, Covington, McCallum and House Park

Exhibit B - Agreement Between Owner and Architect / Engineer

HUB Documents:

Pe-bid Sign-in Sheet

Addendum 1 - Revised Solicitation Schedule

Addendum 2 - Clarifications, Questions and Answers

4/15/20
 

 

 

4/16/20
20CSP105

Selected Roof Improvements at Allison Middle School

Notice of Prevailing Wage Rates

Drawings and Specifications

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Request for substitutions, and Changes to CSP Bid Document

3/12/20
20CSP104

Selected Roof Improvements at Webb Middle School

Notice of Prevailing Wage Rates

Drawings and Specifications

HUB Documents:

Pre-Bid Sign-in Sheet

Addendum 1 - Questions and Answers, Request for Substitutions, and Changes to CSP Bid Documents

Bid-opening Sign-in Sheet

3/11/20
20CSP103

Roof Improvements at Baranoff Elementary School

Notice of Prevailing Wage Rates

Drawings and Specifications

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - revisions to drawings, and request for substitutions

Bid-Opening Sign-in Sheet 

3/10/20
20CSP090

Renovations at Bedicheck Middle School

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - Addition to Instructions to Offerors

Addendum 2 - Technical Submittals

Pre-bid Sign-in Sheet

Addendum 3 - Asbestos Abatement Guide

Addendum 4 - Extension of Opening/ Due Date, and Q&A, New Specifications and Drawings

Addendum 5 - Revised Drawings and New Specifications

Bid Opening Sign-in Sheet

Addendum 6 - Notice of Cancellation

2/13/20
20CSP083

Electrical Panels, Piping and Drainage at Houston Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - Addition to Instructions to Offerors

Pre-bid Sign-in Sheet

Addendum 2 - Change to Project Manual

Bid Opening Sign-in Sheet

2/13/20
20CSP088

Electrical Upgrades and Sit eDrainage Improvements at Gullet Elementary School

Notice of Prevailing Wage Rates

Drawings and Specifications

HUB Documents:

Addendum 1-Request for Competitive Sealed Proposals (CSP)

Pre-Bid Sign-in Sheet

Addendum 2 - Availability List

Addendum 3 - Questions and Answers, Updated Specifications and Drawings

Addendum 4 - Updates to Drawings

Addendum 5 - Clarification Regarding Specifications

Bid Sign-in Sheet

2/11/200
20CSP084

Repairs at Sunset Valley Elementary

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Change in Contact Person, and Updates to Project Manual

Bid-Opening Sign-in Sheet

1/16/20
20CSP087

Upgrades at Cunningham Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Change to Contact Person, and Updates to Specifications and Drawings, Asbestos Report, Questions and Answers 

Bid-Opening Sign-in Sheet

1/16/20
20CSP085

Replacements at Lee Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Photos of Rooftop Units

Addendum 2 - Change to Contact Person, and Updates to Specifications and Drawings

Bid-Opening Sign-in Sheet

1/15/20
20CSP086

MEP Improvements at McBee Elementary

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Change in Contact Person, and Updates to Specifications and Drawings, Questions and Answers

Bid-opening Sign-in Sheet

1/15/20
20CSP089

HVAC, Electrical & Plumbing Improvements at Wooten Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers and Updates to Specifications and Drawings 

Bid-Opening Sign-in Sheet

1/14/20
20CPS052

Renovations at Lamar Middle School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers, Revisions to Pecs and Drawings

Bid Opening Sign-in Sheet

12/12/19
20CSP051

Electrical, Fire Alarm and HVAC Upgrades at Covington Middle School 

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Clarifications, Questions and Answers

Bid Opening Sign-in Sheet

12/11/19
20CSP040

Renovations at Travis Heights Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Updates to Specs and Drawings

Bid Opening Sign-in Sheet

12/10/19
20CSP080

Repairs at Burger Stadium

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers

Addendum 2 - General Revisions, Revised Sheet List, Structural Notes, and Questions and Answers

Bid Opening Sign-in Sheet

12/9/19
20CSP047

Renovations at Walnut Creek Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - HUB Documents Due Date

Pre-bid Sign-in Sheet

Addendum 2 - HUB Document Due Date Clarification, Questions an Answers, Updated Drawings

Bid Opening Sign-in Sheet

12/6/19
20CSP046

MEP Improvements at Ortega Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Changes to Project Manual and Changes in HUB Coordinator

Bid Opening Sign-in Sheet

12/5/19
20CSP045

Renovations at Palm Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Changes to Project Manual

Addendum 2 - Changes to Project Manual

Addendum 3 - Questions and Answers

Bid Opening Sign-in Sheet

12/4/19
20CSP079

HVAC and Civil Improvements at Cook Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - Updated Drawings

Pre-Bid Sign-in Sheet

Addendum 2 - Abatement Specifications and Updated Drawings

Addendum 3 - Questions and Answers

Proposal Opening Sign-in Sheet

12/3/19
20CSP044

Upgrades at Dobie Middle School

Notice of Prevailing Wage Rates

Asbestos Abatement Diagram

Asbestos Abatement Specification

HUB Documents:

Pre-Bid Sign-In Sheet

Addendum 1 - Questions and Answers

Bid Opening Sign-in Sheet

10/31/19
20CSP043

Upgrades at Winn Elementary School

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Abatement Plan

Addendum 2 - Questions and Answers, Clarification

Bid Opening Sign-in Sheet

10/30/19
20CSP042

Upgrades at Rodriguez Elementary School

Issues for Construction - 200023, Rodriguez ES Specifications Section

Notice of Prevailing Wage Rates

HUB Documents:

Addendum 1 - Updates to Specifications

Addendum 2 - Questions and Answers

Bid Opening Sign-in sheet

10/29/19
20CSP024

Urgent Roof Repairs District Wide

Notice of Prevailing Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers

Bid Sign-in Sheet

10/24/19
20CMR041

Modernization at Rosedale School

HUB Documents:

Addendum 1 - Questions & Answers, Clarification

Bid Sign-In Sheet

10/15/19
20CSP013

Chiller Replacement, Lighting and Electrical Upgrades at Odom Elementary School

Wage Rates

HUB Documents:

Pre-bid Sign-in Sheet

Addendum 1 - Change in Solicitation Schedule

Addendum 2 - Questions and Answers and New Structural Sheet

Addendum 3 - Bid Opening Location

Addendum 4 - Questions and Answers

Addendum 5 - Request for Competitive Sealed Proposals (CSP) 20CSP013 Chiller Replacement, Lighting and Electrical Upgrades at Odom Elementary School

Bid Sign-In Sheet

10/3/19
20CMR038

Modernization at Norman Elementary School

HUB Documents:

Proposal Opening Sign-in

Pre-bid Sign-in Sheet

Addendum 1 - Questions and Answers, and Bid Opening Location

Additional Bid Drawings (ZIP)

Additional Civil Specifications (ZIP)

Abbreviations and Sheet Index

Section 274116 Revised - Audio Visual Systems

Addendum 2 - Jobsite Photos

Addendum 3 - Existing Conditions Survey, and Questions and Answers

Addendum 4 - Questions and Answers

Bid Sign-In Sheet

9/24/19
20RFP003

Notification and Scheduling System

T.A. Brown Elementary:

Govalle Elementary:

Menchaca Elementary:

HUB Documents:

Addendum 1 -  Change in Pre-Proposal Conference Location and Time, Restricted Contact Period, and Correction in Proposal

Addendum 2 - Questions and Answers

Pre-Bid Sign-In Sheet

Addendum 3 - Summary of Walk Through and Questions and Answers

8/13/19
20CSP007

Parking Lot Repair for Delco Activity Center

HUB Documents:

Pre-Bid Sign-In Sheet

Addendum 1 - Restricted Contact Period, Questions and Answers

Bid Opening Sign-In Sheet

7/18/19
19RFP137

School Signage and Marquee Installations

HUB Documents:

Pre-Bid Sign-In Sheet 7/10/10
19CSP136

Roof Replacement at Fulmore Middle School

HUB Documents:

Pre-Bid Sign-In Sheet
Addendum 1 - (CSP)
Addendum 2 - (CSP)
Proposal Sign-In Sheet
7/9/19
19CSP134

HVAC Services at ÁùºÏ±¦µä High School

HUB Documents:

Addendum 1 - Addenda Acknowledgement Required and Safety Record Requirement

Pre-Bid Sign-In Sheet

Addendum 2 - Project Revision Items, Submission Requirements

Addendum 3 - Questions and Answers

HVAC Sign-In Sheet

6/27/19
19RFP130

21st Century Learner Furniture

Pricing Proposal (XLS)

Addendum 1 - HUB Requirement

Addendum 2 - HUB Requirements

Pre-Bid Sign-In Sheet

Addendum 3 - Questions and Answers, Exhibit B

Addendum 4 - Change in Due Date

5/14/19
19RFQ127

On Call EWAS Services Campus Support

HUB Documents:

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ126

On Call Safety Services Campus Support

HUB Documents:

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ125

On Call Permitting Services Campus Support

HUB Documents:

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ124

On Call Envelope/ Roofing Services Campus Support

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Revision to Questions

Addendum 2 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ123

On Call Landscaping Services Campus Support

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Clarification on HUB Requirements

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ122

On Call Geotech Services Campus Support

HUB Documents:
HUB No Goals Compliance Guidelines
HUBATT 1 – HUR Form

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ121

On Call A/E Services Campus Support

HUB Documents:

Pre-Bid Sign-In Sheet

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ120

On Call Abatement Services Campus Support

HUB Documents:

Addendum 1 - Questions and Answers

Addendum 2 - Notice of Cancellation

3/26/19

Cancelled

19RFQ117

Real Estate Entitlement and Land Use On Call Consulting for 2017 Bond Projects

HUB Documents:

Addendum 1 - HUB Requirements

Addendum 2 - Question Due Date, Contact Person, Questions and Answers, Copy of Master Services Agreement

3/7/19
19CSP103

Renovations at Odom Elementary School

HUB Documents:

Addendum 1 - Change to Bid Opening Location

Addendum 2 - Revised Proposal Form

Addendum 3 - Change to Procurement Dates

Addendum 4 - Notice of Cancellation

3/6/19
Cancelled
19CSP104

Renovations at Dobie Middle School

HUB Documents:

Addendum 1 - Change to Bid Opening Location

Addendum 2 - New and Revised Drawings and Pre-Proposal Sign-In Sheet

Addendum 3 - Notice of Cancellation

2/21/19
Cancelled
19CSP100

Renovations at Reagan High School

HUB Documents:

Addendum 1 - Change to Bid Opening Location

Addendum 2 - Drawing Updates

Addendum 3 - Revised Proposal Form

Bid Opening Sign-In Sheet

Addendum 4 - Notice of Cancellation

2/19/19
Cancelled

19CSP105

Renovations at Pecan Springs Elementary

Drawings

Specifications

HUB Documents:

 

Pre-Bid Sign-In Sheet

Addendum 1 - Change to Bid Opening Location

Addendum 2 - Q & A, Update Davis Bacon Act Prevailing Wages

Addendum 3 - Questions and Answers

Bid Opening Sign-In Sheet

2/19/19
19CSP084

Mechanical, Electrical and Plumbing Improvements at Martin Middle School

HUB Documents:

Addendum 1 - Change to Estimated Project Budget

Addendum 2 - Change to Bid Opening Location

Addendum 3 - Clarification

Addendum 4 - Updates to Drawings

 

2/12/19
19CSP101

HVAC Services at St. Elmo Elementary School

HUB Documents:

Addendum 1 - Change to Bid Opening Location

Addendum 2 - Notice of Cancellation

2/7/19
Cancelled
19CSP099

Replace and Repair Selected Roof Areas at Anderson High School

HUB Documents:

Addendum 1 - Change to Bid Opening Location

Addendum 2 - Drawings R5, R6, R15

2/6/19
19CSP098

Roof Replacement and Improvements at Kealing Middle School

HUB Documents:

Addendum 1 - Updates to Specifications

Addendum 2 - Change to Bid Opening Location

2/5/19
19CSP080

Renovations at Nelson Bus Terminal

HUB Documents:

Addendum 1 - Revisions to Estimated Project Budget

Addendum 2 - Date Corrections

Addendum 3 - HUB Availability List, Proposal Due Date and Question and Answer, Board Approval Date Change

Addendum 4 - Questions and Answers

Bid Opening Sign-In Sheet

1/29/19
19RFQ083

Building Automation System

HUB Documents:

Addendum 1 - Coversheet Corrected Date

Addendum 2 - Questions and Answers

Addendum 3 - Updated due date

Addendum 4 - Questions and Answers

1/17/19
19RFP033

Structured Network Cabling

HUB Documents:

Addendum 1 - Layout of Appendix A

Addendum 2 - General Clarifications and Question and Answers

1/16/18
19CSP093

Renovations at Kealing Middle School

HUB Documents:

Addendum 1 - Asbestos Report for Kealing Middle School

1/16/19
19RFQ082

Testing and Balancing On Call Services

HUB Documents:

 

1/15/18
19CSP090

Renovations at Highland Park Elementary School

HUB Documents:

1/11/18
19CSP089

Renovations at Allison Elementary School

HUB Documents:

Addendum 1 - Modifications to Documents

Addendum 2 - Modifications to Documents

1/10/19
19CSP087

Renovations at Pleasant Hill Elementary School

HUB Documents:

Addendum 1 - Updates to Drawings

1/9/19
19CSP085

Renovations at Casey Elementary

HUB Documents:

Addendum 1 - Changes to Project Manual and Clarifications

Addendum 2 - Changes to Drawings and Responses to Questions

1/9/19
19CSP086

Renovations at Mathews Elementary School

HUB Documents:

Addendum 1 - Updates to Drawings and Specifications

1/8/19
19CSP088

Renovations at Akins High School

HUB Documents:

Addendum 1 - Updates to Drawings and Specifications

Addendum 2 - Questions and Answers

1/8/18
19CSP071

Roof Replacement at Odom Elementary School

CHE Local

HUB Documents:

Addendum 1

Addendum 2

12/18/18
19CSP077

New Classroom Building at Lee Elementary School

CHE Local

HUB Documents:

Addendum No. 1 - Updates to Drawings and Specifications

12/13/18
19CMR081

Construction Manager At Risk for: ÁùºÏ±¦µä High School, LBJ High School, Casis Elementary, Hill Elementary, Brentwood Elementary and Sanchez Elementary

CHE Local

HUB Documents:

Addendum 1

Addendum 2

Addendum 3

Addendum 4 - Question and Answers, Floor and Site Plans

12/11/18
19CSP070

Renovations at O'Henry Middle School

HUB Documents:

Addendum 1 - CHE Local

Addendum 2 - HVAC Alarm Shutdown Clarification, and Pre-Bid Conference Sign In Location

12/6/18
19CSP067

HVAC and Electrical Improvements at Hill Elementary

HUB Documents:

Addendum 1 - CHE Local

Addendum 2 - CSP Number Correction

Addendum 3

12/5/18
19CSP060

Renovations at Reilly Elementary School

HUB Documents:

Addendum 1 - CHE Local

Addendum 2 - Sign In Sheets, Missing Documents, and MEP Sheets

Addendum 3 - Revisions to Drawings and Project Manual

Addendum 4 - Clarifications and Revisions

12/4/18
19CSP073

Renovations at Jordan Elementary School

CHE Local

HUB Documents:

Addendum 1 - Changes to Project Manual

Addendum 2 - Changes to Project Manual

12/12/18
18RFP086

Fine Arts & Creative Learning Partnerships

Attachment A: Application

12/4/18
18RFP085 Youth & Family Enrichment OST Programming

12/4/18
19CSP051

Roof Improvements at Walnut Creek

Specifications and Drawings

HUB Documents:

Addendum 1

Addendum 2

11/29/18
19CSP058

Houston Elementary School Roof Replacement

Specifications and Drawings

Pre-Bid Sign-in Sheet

HUB Documents:

11/28/18
19CSP057

Transportation Move to Service Center

Specifications

Floor Plan Level 2 Drawings

HUB Documents:

Addendum 1

Addendum 2

11/27/18
19RFP054

 

HUB Documents:

Addendum 1

Addendum 2

11/6/18
19RFP043

HUB Documents:

Addendum 3

10/24/18
19RFP047

HUB Documents:

10/23/18
19RFP042

HUB Documents:

 10/6,/18

10/17/18

19RFP037

HUB Documents:

10/9/18
19RFP040

HUB Documents:

10/9/18
19CMR035

Construction Manager at Risk:  Modernization for Norman Elementary School

Required forms for Review and Submission for Construction â€Œ

9/11/18